Curing a concrete block foundation wall is a critical step in ensuring the strength and durability of the structure. The correct choice indicates that a concrete block foundation wall should be cured for 48 hours before backfilling. This timeframe allows the concrete to achieve a significant amount of its initial strength through hydration.

During the first 48 hours after placement, concrete continues to cure and develop its strength due to the chemical reaction between water and cement. Backfilling too soon can introduce significant pressure on the wall while it is still vulnerable, potentially leading to cracking or other structural issues.

Following the recommended curing period is essential not only for the integrity of the foundation but also for the overall stability of the structure being built on top of it. Therefore, allowing at least 48 hours ensures the concrete has adequately set before any additional loads are applied or surrounding soil is moved in.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy