Browse all practice questions for the Virginia NASCLA Practice Exam. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

Virginia NASCLA Practice Exam course image
More practice questions

These questions are part of the practice quiz. Start practicing

  • Who is in charge of a local building department?
  • What does a contract imply regarding an insurance agreement that a contractor must have?
  • What is the maximum slope for a ramp?
  • A lengthwise grain separation between or through the growth rings of lumber is called?
  • What may be covered by an allowance in a contract?
  • How much state income tax must a corporation with $30,000 of Federal taxable income pay in Virginia?
  • What is the maximum flame spread index for insulation materials?
  • What is essential for ensuring the safety of employees when dealing with hazardous materials?
  • When should a third stairway stringer be used?
  • What is the minimum height for a stairway handrail?
  • For a building's drainage, what is considered a positive slope away from a foundation?
  • What are the three primary elements of a contract?
  • What is a requirement for a joint venture in contracting?
  • How many linear feet of 2 x 8 will be required for the second floor window openings?
  • Approximately how many concrete block units are required for the stem wall between the two bay areas on the north side of the house?
  • What is the elevation at the lowest point at the perimeter of a 140-foot wide paved area sloped at 1/8 inch per foot with the highest point at 87.2 feet?
  • What should contractors aim for when providing a change order due to increased costs?
  • What is the minimum lap of rabbeted horizontal lap siding?
  • When signing an agreement with a corporate representative, a contractor should?
  • What is it considered when a contractor uses funds intended for one project to start a different project without paying laborers for the original project?
  • Which type of insurance would usually cover damage to property while a job site accident occurs?
  • Which of the following would typically be covered by a contractor's comprehensive general liability insurance policy?
  • What percent should an employer withhold for Virginia withholding on a separate supplemental payment for vacation?
  • Why are escape devices necessary for deep trenches?
  • In construction estimating, what is a common practice to account for construction delays?
  • What scale does a set of plans drawn in 1/4 inch = 1 foot represent in terms of actual size?
  • What should be added to wage rates to ensure accuracy in estimating labor for a project?
  • How much fill material will be needed for the column footing pads assuming a compaction loss of 15%?
  • How often do exterior brick surfaces that are painted generally require repainting?
  • How many bundles of shingles are required to cover a building with an area of 3,350 square feet and a 3 in 12 roof slope?
  • What is the purpose of diagonal bracing in wall framing?
  • What happens when a claimant is paid funds from the Contractors Recovery Trust Fund?
  • In a cost-plus contract with direct costs of $60,000, what is the total amount due the contractor if the project is completed 3 days early?
  • Nails used to fasten concrete roofing tiles must penetrate the deck a minimum of how many inches?
  • Escape devices for a trench deeper than 4 feet must be located within a maximum of how many feet of the worker?
  • What is the name of the process where major project participants meet to identify shared goals before starting a project?
  • A licensee's name change must be reported to the Board within how many days?
  • A contract for which of the following types of structures may be subject to recovery from the Transaction Recovery Fund?
  • What does the term "flame spread" refer to?
  • What is the diameter of number 5 rebar?
  • Compensation paid to independent contractors is reported on which form?
  • In the correct sequence for installing a bifold door, which component comes first?
  • For how many days must an employer post a citation for a Virginia OSHA violation near the place of violation?
  • How often should employees watch for possible hazards at the jobsite?
  • What does a comprehensive general liability insurance policy typically protect a company against?
  • Dampproofing on below-grade masonry foundation walls shall extend from the top of which structure to the finished grade?
  • What must be done with taxes withheld by an employer between the time they are withheld and sent to the IRS?
  • How much would a contractor pay in premiums for $300,000 of coverage at a rate of $8 per $1,000 without any discounts?
  • Which type of material at a construction site is typically considered hazardous waste?
  • What MUST be included in an estimate for a job?
  • What is the typical exposure of 3-tab asphalt shingles?
  • What is the maximum recommended spacing for 5/8-inch drywall installed on a wall at right angles to framing members?
  • When will contractors be assessed a fee for the Transaction Recovery Fund?
  • Costs that relate to construction activity but are NOT easily identifiable for a specific project are considered?
  • Who is required to follow the Fair Labor Standards Act?
  • Which of the following is NOT typically covered under a standard liability insurance policy?
  • What is the requirement for the thickness of masonry unit bed joints for the second course?
  • What type of wood framing method is being used when wall framing is constructed one floor at a time?
  • What is the volume of soil to be removed from a trench excavation measuring 2' x 300' x 4' in cubic yards?
  • A contractor puts in a claim under a comprehensive standard general liability policy. How much is the insurance company liable for if the total damages are $5,550 and there is a $500 deductible?
  • What is the purpose of posting an OSHA citation?
  • What is a primary difference between a project manager and a project superintendent?
  • According to the Board Rules and Regulations, what constitutes a full-time employee?
  • What is the minimum required distance between suction outlets for a swimming pool?
  • When calculating gross pay, what additional factor must be considered for non-exempt employees working more than 40 hours in a week?
  • What is typically the main benefit of partnering in a construction project?
  • How far must material stored inside a building under construction be from an inside floor opening?
  • What is the primary purpose of contractor licensing?
  • If a roof has a 6 in 12 slope, what multiplier should be used for area conversion?
  • What is the minimum distance from the bottom of the ceiling framing to the top of the ceiling grid system in suspended ceilings?
  • What is the maximum width for a footing projection?
  • Temporary erosion and sediment control measures must be removed within a maximum of how many days after final site stabilization?
  • Which of the following estimating methods is typically used by the architect rather than the contractor?
  • What is the minimum overlap for joints in the polyethylene film moisture barrier applied over the exterior of a below-grade foundation wall?
  • What is the minimum length of drywall screw for installing 1/2-inch gypsum board to wood studs?
  • Which of the following is considered ethical behavior in a construction context?
  • Which of the following is considered a source document in an accounting system?
  • What is the cost per cubic foot to finish floor slabs?
  • What is the minimum grade fall away from foundation walls?
  • For the purpose of withholding taxes, what kind of payment is treated separately according to Virginia regulations?
  • The prime contractor is primarily responsible for what aspect of a project?
  • What can be determined by summing the project activities into an overall schedule?
  • What is the primary advantage of using a partnership structure for a business?
  • Losses from the sale of a company asset are categorized as what type of expense?
  • What type of insurance is essential for a partnership to ensure the business continues if one partner dies?
  • If it costs $0.45 per cubic foot to finish floor slabs, how much will it cost to finish the floor of the garage?
  • What is the total value of current assets for an accrual basis company with given financial specifics?
  • What is considered the best business practice for special-ordered materials?
  • What is the total workers' compensation rate for a contractor who pays different rates based on payroll classifications?
  • According to the Board Rules and Regulations, who can be considered a qualified individual?
  • A contractor should do all of the following when estimating a project EXCEPT?
  • All of the following are considered general conditions that could affect costs directly associated with a specific project EXCEPT?
  • Generally, who is responsible for ensuring that a project meets all zoning requirements?
  • In a lump sum contract of $160,000 with 10% retainage, what should the final payment request be after 75% progress payments?
  • How much must an employer send to the IRS if they withheld $765 for employee Medicare and Social Security taxes?
  • What is the minimum concrete covering for steel reinforcement in a footing?
  • What action can be taken against a contractor found guilty of fraud?
  • Using which option would cause the greatest increase in the insulation value when re-siding with aluminum?
  • What is the maximum distance between a ventilating opening in an under-floor space and each corner of the building?
  • What is the maximum spacing for ties in a block wall used with wood framing?
  • When using cash accounting, which accounting standard is applied to determine net income?
  • What are batter boards used for in construction?
  • An appeal of a final decision of a county on an erosion control plan must be filed within a maximum of how many days?
  • How many treads are required for a set of stairs with an 8-foot rise?
  • What is included in a company's balance sheet?
  • What is the average collection period ratio for a firm with $365,000 in annual revenues and current receivables of $6,600?
  • How is the hand of a door determined?
  • Before excavating for a new building, what should be done to determine subsoil conditions?
  • Given a company's previous revenues of $500,000 and overhead of $115,000, what should be the bid price for a project with $80,000 in direct costs if aiming for a 10% profit?
  • Deck stairs should be designed to achieve what purpose?
  • Where is temporary horizontal bracing attached when erecting trusses?
  • The main reason for spacing contraction joints in a concrete slab is to?
  • How must rafters be framed to each other?
  • What is the cost difference when changing from carpet to ceramic tile in the second-floor office?
  • An appeal of a local building official's decision regarding the USBC modification must be made within how many days?
  • What should be considered when selecting a slope ratio for ramps?
  • Which type of tax does not typically include federal tax deductions for a corporation in Virginia?
  • How should flexible (batts) insulation placed in floor joists above an unheated crawl space be supported?
  • What is the primary purpose of a conceptual estimate in architecture?
  • What is the minimum breaking strength required for safety belt lanyards?
  • If a company bills $38,000 in completed work and receives payments of $22,000 plus $8,000 from the previous month, what is the net income for the month when using cash accounting?
  • What is a necessary consideration for the design of deck stairs in addition to slope?
  • Approximately how many 12-inch concrete block cells will require a #5 rebar?
  • What form can an employee use to request advance earned income credit?
  • What is the implication of a loss reported in the cash accounting method?
  • How many sheets of 4' x 8' x 1/2" drywall are required for a room sized 10' x 15' with an 8-foot ceiling?
  • A building official must issue a certificate of occupancy within how many working days of the request?
  • In which scenario would a builder first check local utility companies?
  • Where would the depreciation of equipment first be entered in accounting records?
  • What is the allowable MINIMUM specified compressive strength for concrete in foundations not exposed to weather?
  • What system can be used to collect information on labor, materials, equipment, and overhead costs during a job?
  • How often must an employer who withholds more than $1,000 per month for state taxes pay those taxes?
  • What is the adjusted contract price for a change order that increases costs by $15,000 and $2,250 in overhead, while relieving $18,000 and $2,400 in costs, including a desired profit of 20%?
  • Which of the following is NOT a benefit of platform construction compared to balloon construction?
  • Which business structure provides limited liability protection to its owners?
  • What is the initial license fee for a Class A contractor?
  • What type of joint is used to connect rafters at the ridge in roofing?
  • For what reason is retainage often held back in construction contracts?
  • What happens if a contractor does not pay laborers for work done on a project?
  • What is the maximum penalty for a contractor who undertakes work without the proper class of license?
  • Approximately how many materials are currently on the EPA hazardous materials list?
  • What is a primary way to protect a contractor from risk?
  • What should a contractor ensure to maintain compliance with regarding their employees?
  • The two basic laws of construction estimating are?
  • What additional proof is often required when applying for a contractor's license?
  • Medical records of work-related injuries to long-term employees MUST be kept for a minimum duration of how long after employment ends?
  • An agreement that calls for a contractor to be paid actual costs for labor and materials plus a fixed fee for the contractor's overhead and profit is called a?
  • What structural element is typically used for support over wide window openings in framed walls?
  • What is the maximum dimension of the ventilation coverings for under-floor space?
  • A company's net worth is equal to what?
  • If a contractor plans to use materials or methods that deviate from industry standards, what should they do?
  • What is the maximum amount of a lien that can be claimed by a subcontractor for unreceived payments on a two-family residential property?
  • Which of the following must be licensed?
  • What is the primary purpose of surveillance cameras on a job site?
  • Additions to buildings must comply with what standards?
  • When debris materials are dropped more than 20 feet to a container outside a structure, how should they be handled?
  • What is an important factor in ensuring that a construction schedule is followed?
  • A reason for using a lower than usual profit markup for a specific project could be to achieve what goal?
  • What is the maximum spacing for double floor joists that are separated to allow installation of piping?
  • What type of insulation is least likely to absorb moisture?
  • What is the consequence of a contractor allowing their license to expire?
  • How many inches should there be between a handrail and an adjacent wall?
  • When calculating the number of bricks required, what is the standard number of bricks per square foot?
  • What is the total project overhead for a project that has specified costs such as labor and materials?
  • Why is it important to evaluate subcontractors before hiring?
  • Which of the following is a significant hazard associated with flame spread?
  • Which of the following represents the dimension of a standard plank used in construction?
  • What is the primary purpose of establishing scaffolds away from power lines?
  • Payments from the Transaction Recovery Fund to claimants may include an amount for which additional cost?
  • What is the first step to take before starting any excavation work?
  • Attic spaces should be vented primarily for which purpose?
  • Records of an employee's exposure to hazardous materials MUST be kept for a minimum of how many years?
  • Which window type consists of an upper and a lower sash that slide vertically in the side jambs?
  • The nailing holes in aluminum and vinyl siding are elongated to allow for what?
  • Which of the following is required in a licensure application?
  • A bid that does NOT specify how long it remains open or in effect is considered to be open for?
  • The extension of dampproofing is crucial for preventing what issue?
  • What is the minimum bearing required at both ends of a double 2 x 8 header at window openings over 5 feet wide?
  • From where does the information for a company's financial statement originate?
  • What type of information can disqualify an applicant from receiving a contractor's license?
  • What is NOT required in exterior nonbearing walls?
  • Which of the following statements about a sole proprietorship is true?
  • How many board feet of lumber are in 26 planks measuring 3" x 16" and 24 feet long?
  • How much in premiums will a contractor save over a 3-year period if they have a defined safety program that yields a 20% reduction on an $8 per $1,000 coverage rate for $300,000?
  • Which of the following is NOT typically a characteristic of platform framing?
  • What is the significance of having a minimum breaking strength for safety belt lanyards?
  • What kind of payment structure does a cost-plus contract involve?
  • What is the maximum spacing for masonry veneer to supporting wall anchors in non-seismic locales?
  • How many cubic yards of concrete should be used for structural purposes in typical residential construction?
  • Equipment needs for a project are best estimated by what method?
  • What is J-trim used for in drywall applications?
  • A verified claim for payment from the Transaction Recovery Fund must occur within a maximum period from what date?
  • Plastic roof cement should never be applied to the bottom edge of a shingle to seal it because?
  • How many cubic yards of concrete will be needed to pour the slab of the garage?
  • In the context of hiring a construction manager, which statement about subcontractors is true?
  • What is the minimum distance that scaffolds must remain from a 50-kV power line?
  • A drainage slope of 5% equals what drop in 10 feet?
  • When a jack rafter is face nailed to a hip rafter, what is the minimum number of 16d common nails that should be used?
  • What is the total amount of Medicare and Social Security taxes withheld by an employer from a weekly earning of $3,000?
  • According to covenants, what is the minimum distance a home can be placed to the front of the lot?
  • Which document details the work to be done and the cost of performing it?
  • What type of business organization allows people to share financial resources?
  • What is the minimum duration for which time card records must be kept?
  • What is the length of line AC if it equals the length of line DB in a rectangular drawing?
  • What is the minimum illumination required for general construction area lighting?
  • Given a roof slope of 3 in 12, what factor should be used to convert the plan area to actual roof area?
  • What is the employment status of a carpenter being paid $16 per hour who completes a project while working under the contractor's defined schedule?
  • Who is responsible for overseeing compliance with Material Safety Data Sheets?
  • Unless otherwise specified, the standard guideline for spacing contraction joints is to space them in feet at what ratio to the slab depth in inches?
  • What must all Class A contractor licensure applications include?
  • What effect does increasing the slump of concrete have?
  • What is the gross pay of a non-exempt employee who works 45 hours during a holiday week, receiving additional holiday pay, earning $12.50 per hour?
  • What is the primary purpose of nailing fasteners in roofing tiles?
  • How long should a concrete block foundation wall be cured before backfilling?
  • In the specifications, how many bricks are required for the west wall of the first story?
  • What is the minimum square footage of net clear opening area for an egress window in a second-floor sleeping area?
  • What is the minimum roof slope required for modified bitumen roofing?
  • In calculating average collection period, which factor primarily affects the results?
  • What is the minimum wallboard thickness for the walls separating a house and garage?
  • All of the following are advantages of good scheduling EXCEPT?
  • What is a potential disadvantage of a sole proprietorship?
  • What is the minimum number of fasteners required for clay perimeter roof tiles?
  • A firm desiring to be licensed as a Class B contractor must have a minimum net worth of what amount?
  • How often should an employer review safety practices related to trench work?
  • Which type of lumber has the largest natural moisture content?
  • Which practice is crucial for minimizing workplace injuries on a job site?
  • Contractors assessed a fee to support the Transaction Recovery Fund must pay this fee within how many days from the assessment notice?
  • For a non-exempt employee covered by the Fair Labor Standards Act working 60 hours a week for a flat rate of $400, what should their gross pay be for that workweek?
  • How often must an employer report information on the number of employees and new hires to comply with the Child Support Enforcement Act?
  • If a permit is obtained on May 1 and labor begins on May 11 with an estimated 15 days of required labor, how many float days are available for labor?
  • When must work be stopped following the issuance of a stop work order?
Subscribe